Weekly Report 10: 11/2-11/9
Current status of project:
The group has met and ordered all necessary materials for the prototype. The group has met to discuss the details of the chosen design, including further investigating mechanical components, choosing specific products for the model, and figuring out the most efficient way to manufacture the device.
Work planned for next week:
The group plans to meet to begin building the prototype and developing a working software for proof of concept. The group will begin to develop the final paper, which includes finding components for the design (including specs sheets, circuit schematics, etc.) Because the paper is due after the break, the group will attempt to accomplish as much of the physical embodiment as possible.
Anything needed from client or TA or instructor to continue work:
Nothing at the moment.
The group has met and ordered all necessary materials for the prototype. The group has met to discuss the details of the chosen design, including further investigating mechanical components, choosing specific products for the model, and figuring out the most efficient way to manufacture the device.
Work planned for next week:
The group plans to meet to begin building the prototype and developing a working software for proof of concept. The group will begin to develop the final paper, which includes finding components for the design (including specs sheets, circuit schematics, etc.) Because the paper is due after the break, the group will attempt to accomplish as much of the physical embodiment as possible.
Anything needed from client or TA or instructor to continue work:
Nothing at the moment.